top of page

Projects

Our projects are dominantly centred around dams and hydropower, however our skill base also allows for high quality geological assessment of any civil and mining project. 

 

We have provided services for dam owners across Australia and New Zealand, with further dam and civil works in Oman, New Caledonia, Papua New Guinea, China, and Myanmar.

​

Our GIS abilities allow for project data to be captured and stored spatially, creating robust databases for the future.

Mount Gordon Tailings Storage Strategy

Client:  Engeny

Date:    2025​​

​

​

P4070005_edited.jpg

Cressbrook - Dam Safety Upgrade Project

Client: SMEC

Date: â€‹â€‹

​

​

Cressbrook.jpg

Denyer Quarry

Client: Engeny

Date: â€‹â€‹

​

​

P4070005_edited.jpg

Queensland Hydro Projects

Client: SMEC

Date: 2021 - Current​​

​

Responsible for reviewing documentation, rock core, soil samples, and other site-specific information for local conditions of the dam foundation, abutments, appurtenant structures, tunnels, powerhouses, and potential borrow areas. Provision of technical review and design guidance as part of the Owner's Engineering Team, Engagement with design consultants and Technical Review Panel.

IMG_7116_edited.jpg

Bunkers Hill PHESS, Queensland

Client: Pacific Hydro Limited

Date: 2021 - 2023

​

Responsible for geological review of proposed scheme options and development of staged geological and geotechnical investigation.

P4070005_edited.jpg

Sepik Development Freida Dam, Papua New Guinea

Client: Conservation and Environment Protection Authority, Government of Papua New Guinea

Date: 2019 - 2023

​

The project involved technical review of the Freida River Hydroelectric Project (FRHEP) embankment, temporary infrastructure, comprehensive gap analysis of the design report, and geotechnical stability of the ISF embankment.

Freida River.jpg

Rookwood Weir - Technical Review Panel, Queensland

Client: Sunwater

Date: 2020 - 2024

​

Member of the Technical Review Panel for the Rookwood Weird Project, constructed on the Fitzroy River. Responsible for review of geological and geotechnical matters.

IMG_6322_edited.jpg

North Pine Dam Stability Improvement Project

Client: SMEC

Date: â€‹â€‹

​

​

NPD.jpg

St. Elmo Vanadium Water Supply Dam

Client: Engeny

Date: â€‹â€‹

​

​

St Elmo_edited.jpg

Wuruma Dam Safety Assessment

Client: 

Date: â€‹â€‹

​

​

1c81548c-f52a-4b1a-ae38-7696763c149d.jpg

Mount Bold Dam Safety Upgrade Project, South Australia

Client: SA Water Limited

Date: 2021 - Current

​

Responsible for the revie of geological and geotechnical data relating to the dam and borrow areas, design of a geotechnical investigation of the dam and auxiliary spillway, development of a Geotechnical Interpretive Report, and design input parameters. Engagement with Technical Review Panel.

66717578824__0C1B48C8-A128-4A1C-A1BD-CEE82457129A.JPEG

Waimea Dam Project - Technical Review, New Zealand

Client: Damwatch Engineering Limited

Date: 2019 - 2023

​

Technical review of geological and geotechnical matters during re-design and construction.

IMG_3811_edited.jpg

Lakelands Irrigation Area Detailed Business Case, Queensland

Client: Regional Development Australia (Tropical North)

Date: 2020 - 2023

​

Responsible for the reconnaissance, design, and execution of the geological investigation of the proposed dam site and hydroelectric generation scheme.

DJI_0224.JPG

Hells Gate Dam & Irrigation Scheme Business Case, Queensland

Client: Townsville Enterprises Limited

Date: 2020 - 2022

​

Responsible for the design and specification of the geological and geotechnical investigation, and internal technical review of the project.

IMG_8358.JPG

We are located in North Brisbane, QUEENSLAND, AUSTRALIA.

  • Facebook
  • Linkedin

 

© 2025 Middle Third Geological

ABN 49 050 579 328

bottom of page